End-To-End Visibility and Control for Supply Chain Mastery
The Quintiq Mining Supply Chain Suite optimizes the entire mining supply chain and its components. The Suite offers mining supply chain players a unique opportunity to configure an end-to-end solution for maximum planning integration, operational efficiency, and profitability.
Key mining supply chain benefits include:
-
Strategic, tactical and operational planning that matches your specific needs
-
Full visibility, measurement and control of operations and KPIs
-
Real-time event management, re-optimization of plans, and decision support
-
Improved service, delivery times and customer satisfaction
-
Reduced operating, inventory, maintenance and transportation costs
-
Maximized resource utilization and productivity
Mining supply chain solutions that capture your unique operational reality
Exceptional results come from the perfect fit between your operational reality and supply chain solution. Quintiq is uniquely able to guarantee such a fit with its:
Mine to Ship Supply Chain Solution
Gain end-to-end network visibility, and plan across multiple horizons right through to ‘day of operations’ for:
-
planning at the seam
-
ROM and RAW stock
-
production and preparation plants
-
finished goods
-
rail, port & shipping, and more
Rail Logistics Solution
Gain real-time insight into the impact of rail schedules on yard machine use and shipments. Plan:
-
through load trains
-
trains with multiple products
-
trains split between through load and stock piles
-
the assignment of trains to stockpiles
based on planned train receipts and reclaim jobs.
Port Logistics Solution
Gain accurate assessments of when each yard job will be completed and the impact of this on:
The impact of planned and unplanned maintenance is fully integrated into this solution.
Stockpile Scheduling Solution
Gain full visibility into the state of the stockyard, and plan stockpiles to ensure that future allocations can be accommodated.
-
Allocate shipping requirements, planned trains (2 – 14 days) and scheduled trains (1 – 2 days) to stockpiles according to time periods you select
-
Factor in changes in train schedules and quantities loaded
-
Quarantine or blend items into stockpiles
Berth Scheduling Solution
Maximize berth utilization and schedule all ship movements from one minute to 14 days in advance, taking into account complex rules such as:
-
tidal effects
-
tug and shipping officer constraints
-
hatch pours with different products
-
multi-ship berthing
-
shiploader activity
-
direct through loading from trains to ships
-
the impact of a wide range of delays